Skip to content

Commit b85e9b4

Browse files
BenjaminDannegardmarqdevx
authored andcommitted
Added last touches
1 parent 8979a94 commit b85e9b4

File tree

1 file changed

+16
-8
lines changed
  • content/hardware/04.pro/miscellaneous/enclosure-kit/tutorials/assembly-instructions

1 file changed

+16
-8
lines changed
Lines changed: 16 additions & 8 deletions
Original file line numberDiff line numberDiff line change
@@ -1,27 +1,27 @@
11
---
22
title: 'Assembling the Enclosure Kit'
33
difficulty: easy
4-
description: "Learn how to assemble the enclosure kit for the Portenta Machine Control"
4+
description: "Learn how to assemble the enclosure kit for the Edge Control"
55
tags:
66
- Assembly
77
- Getting started
88
author: 'Benjamin Dannegård'
99
hardware:
10-
- hardware/04.pro/carriers/portenta-machine-carrier
10+
- hardware/04.pro/carriers/edge-control
1111
- hardware/04.pro/miscellaneous/enclosure-kit
1212
software:
1313
-
1414
---
1515

1616
## Introduction
1717

18-
![The enclosure kit and Portenta Machine Control](assets/enclosure-kit.png)
18+
![The enclosure kit and Edge Control](assets/enclosure-kit.png)
1919

20-
The enclosure kit features a LCD screen on top and a perfectly fitted case for the Portenta Machine Control.
20+
The enclosure kit features a LCD screen on top and a perfectly fitted case for the Arduino Edge Control.
2121

2222
### Required Hardware and Software
2323

24-
- [Arduino® Portenta Machine Control](https://store.arduino.cc/products/arduino-portenta-machine-control)
24+
- [Arduino® Edge Control](https://store.arduino.cc/products/arduino-edge-control)
2525
- [Arduino® Enclosure Kit]()
2626

2727
## Assemble the kit
@@ -30,7 +30,7 @@ The enclosure kit features a LCD screen on top and a perfectly fitted case for t
3030
<source src="assets/edge-control-kit-assembly-animation.mp4" type="video/mp4"/>
3131
</video>
3232

33-
Once you got all the parts and a Portenta Machine Control, we can start with placing the Portenta Machine Control into the bottom part of the enclosure kit.
33+
Once you got all the parts and a Edge Control, we can start with placing the Edge Control into the bottom part of the enclosure kit.
3434

3535
![First step](assets/1st.png)
3636

@@ -42,7 +42,7 @@ Now place the LCD screen into the top part of the enclosure kit.
4242

4343
![Third step](assets/3rd.png)
4444

45-
To connect the screen to the carrier, plug one end of the cord into the under side of the LCD screen, the other end of the cord goes into the connector slot on the Carrier.
45+
To connect the screen to the carrier, plug one end of the cord into the under side of the LCD screen, the other end of the cord goes into the LCD connector on the Edge Control.
4646

4747
![Fourth step](assets/4th.png)
4848
![Fifth step](assets/5th.png)
@@ -51,4 +51,12 @@ Finally you can put the upper part that holds the screen on the bottom part that
5151

5252
![Last step](assets/6th.png)
5353

54-
There you go, a perfectly fitted enclosure for your Portenta Machine Control with an LCD screen!
54+
There you go, a perfectly fitted enclosure for your Edge Control with an LCD screen!
55+
56+
57+
## Next step
58+
59+
Now that you have your Edge Control hooked up to a LCD screen you might want to test the set up out. Feel free to take a look at our tutorials for the Arduino Edge Control.
60+
61+
- For simple getting started instructions for the Edge Control, look no further than our [Getting Started tutorial](https://docs.arduino.cc/tutorials/edge-control/ec-ard-gs)
62+
- For a more in-depth look at the Edge Controls features head on over to our [Connecting and Controlling a Motorized Ball Valve tutorial](https://docs.arduino.cc/tutorials/edge-control/ec-ard-3wirevalve)

0 commit comments

Comments
 (0)