Skip to content

Commit 8979a94

Browse files
BenjaminDannegardmarqdevx
authored andcommitted
Added gif and images
1 parent 684fc02 commit 8979a94

File tree

9 files changed

+26
-3
lines changed

9 files changed

+26
-3
lines changed

content/hardware/04.pro/miscellaneous/enclosure-kit/tutorials/assembly-instructions/content.md

Lines changed: 26 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -15,7 +15,7 @@ software:
1515

1616
## Introduction
1717

18-
![The enclosure kit and Portenta Machine Control](assets/enclosure-kit.img.png)
18+
![The enclosure kit and Portenta Machine Control](assets/enclosure-kit.png)
1919

2020
The enclosure kit features a LCD screen on top and a perfectly fitted case for the Portenta Machine Control.
2121

@@ -26,6 +26,29 @@ The enclosure kit features a LCD screen on top and a perfectly fitted case for t
2626

2727
## Assemble the kit
2828

29-
![How to assemble the kit](gif)
29+
<video width="100%" controls="true">
30+
<source src="assets/edge-control-kit-assembly-animation.mp4" type="video/mp4"/>
31+
</video>
3032

31-
Place the Portenta Machine Control in the bottom part of the enclosure kit. Next place the LCD screen cover over the screen. Now place the LCD screen into the middle part of the enclosure kit. To connect the screen to the carrier, plug one end of the cord into the under side of the LCD screen, the other end of the cord goes into the connector slot on the Carrier. Lastly, you can now put the upper part that holds the screen on the bottom part that holds the Carrier.
33+
Once you got all the parts and a Portenta Machine Control, we can start with placing the Portenta Machine Control into the bottom part of the enclosure kit.
34+
35+
![First step](assets/1st.png)
36+
37+
Next place the LCD screen cover over the screen.
38+
39+
![Second step](assets/2nd.png)
40+
41+
Now place the LCD screen into the top part of the enclosure kit.
42+
43+
![Third step](assets/3rd.png)
44+
45+
To connect the screen to the carrier, plug one end of the cord into the under side of the LCD screen, the other end of the cord goes into the connector slot on the Carrier.
46+
47+
![Fourth step](assets/4th.png)
48+
![Fifth step](assets/5th.png)
49+
50+
Finally you can put the upper part that holds the screen on the bottom part that holds the Carrier.
51+
52+
![Last step](assets/6th.png)
53+
54+
There you go, a perfectly fitted enclosure for your Portenta Machine Control with an LCD screen!

0 commit comments

Comments
 (0)